This past week started out at my friend Lisa's again where I just finished up her porch enclosure. She asked me to hang her new hanging outdoor lighting all around her front porch.
Then I installed a garage hanging storage rack for a new client in Mt Juliet.
Anjie, another awesome regular client of mine texted me a couple photos this past week of the destruction of a section of her new fence cause by a falling tree. The tree fell from the neighbor's side of the fence, and the neighbor agreed to cut up the tree, while Anjie covered the cost of the fence repair. That's where I came in. I patched in the new section of fencing to look just the way it did before the tree took it out.
Then finally, at the end of this past week I began phase 3 in the multi-phase painting project for my client, Amanda. This phase will include her Master Bedroom, including her Master 1/2 bath, and hallway. Which includes one side of all the doors in the hall. One door badly needed some repairs. The bottom was badly damaged, so I scraped off any loose wood, sanded it, filled in the area with Bondo, and then sanded it smooth. The louver door for the HVAC closet was very dirty due to the air return inside the closet, so air (and dust) flows through the louver slats. It needed deep cleaning, so after cleaning and sanding it, I painted both sides of that door.
View our "Projects of the Week" photo albums on our Facebook page, and other videos as well
www.facebook.com/TriumphHandymanService