This past week I returned Al's rental property in Lebanon, TN. Al is one of my RPTS clients (Rental Property Turnover Services). He had a few delays and wasn't able to have the place ready by June 1st, but the tenants are finally moving in this coming week. The painting was completed, and I went back in to install all the new door hardware. Then some shelving in the kitchen pantry and a bedroom closet.
I also was in Gallatin where I've been working at another RPTS client's rental property. I knocked out a few key tasks this past week there. There wasn't any bathroom vent fan ducting before, and the old fan was venting straight into the attic, so I ran new ducting out to the back of the house. There was a new small storage room added to the back of the house where the water heater is, and I had to run the new ducting through it. I wrapped the ducting with insulation where it runs through the storage room, and out through the vent wall cap that I installed above the door outside.
I also had to patch in the ceiling, and the wall where the old fan switch was, and floated a couple coats of drywall mud to seal it all up. I also filled nail holes and caulked around all the new door casings that I installed the week before. The new garbage disposal air switch was installed as well. There was a lot of rain that flooded his lawn and a visitor came up from the creek running behind his backyard.
The goal is to have Albert's rental Gallatin ready for tenancy by August 1st, but I have a small bathroom project that I scheduled months ago that will take me away from Gallatin for about 2 weeks. Then I'll return for most of the month of July to finish it up.
At the end of the week I returned to my regular client Lisa's house to assemble some outdoor patio furniture, which she had begun to assemble herself, but left it for me to finish. I'll be hanging the porch swing bench this coming week also.