It was a very busy this past week in Clarksville. Before the carpet installers came I made sure that the flooring in the upstairs bathrooms was down. That way they could create a nice clean carpet tuck without the need of a transition strip between the two floor types. Krys and I also wrapped up almost all the painting including the walls, the front door (both sides), back door (both sides), the stair banisters, and the address number plaque.
Mary and Albert scheduled the countertops and backsplash install as well, on separate days. After the adhesives set I went ahead and installed the new faucet, and re-directed the plumbing from a double to a single sink configuration. I also reattached the disposal, and installed a couple new light fixtures.
I started the flooring install downstairs at the end of the week, and it continued through the weekend. The 1/4 round shoe molding will be installed, caulked, and painted next after the flooring is down. By the end of the following week we should be finished with all the tasks and in cleanup mode.
View our "Projects of the Week" photo albums on our Facebook page, and other videos as well
www.facebook.com/TriumphHandymanService