Kevin, a close friend of my brother Dave and I ran into a problem with his contractor and asked us to help him to get some projects completed around his home to prepare for putting it on the market. We plan to renovate 4 bedrooms and the kitchen, including new flooring, new windows & doors, and painting, along with a few smaller projects spanning over a few months which started in mid July, and wrapping up by December. Along with some work in both his attached and detached garages as well.
This really busy week began with sprucing up their laundry room and 1/2 bath. I had to patch and repair many areas on the walls and ceiling first. Then primed the patches with PVA drywall primer before painting both rooms. I masked all the trim and base that I painted a while back, except for the bath. I still had to paint that first before the walls. Then I installed the two new cabits, and will be installing the cabinet crown molding later after I finish bedroom 3 in time for their family to stay in while they're here for Thanksgiving.
I had many wall blemishes to tackle in bedroom 3 also before painting, and I installed the new flooring first because the patches were not dry enough to sand yet. In next week's album you will see the newly painted ceiling, walls and trim.
Here's what we tackled on this refresh:
✔️ Patched every hole and blemish
✔️ Primed the patches with PVA drywall primer
✔️ Masked the trim and bathroom floor for clean lines
✔️ Painted the ceilings and walls in both rooms
✔️ Installed new laundry room cabinets
✔️ Installed a new vanity light fixture
✔️ Installed a new medicine cabinet
✔️ Installed new flooring in bedroom 3
The prep is what makes the paint look this good. 👍
Need a room refreshed? Call or text Triumph Handyman Services today: 629-250-8135
(Music Attributed to Kevin MacLeod)
#NashvilleHandyman #MtJuliet #Paint #Cabinets #Lighting